AEPL Group has its long standing experience in Energy Sector and excels in various diversified business activities, ranging from Plant Construction to Electro-Mechanical Contracting, Operation & Maintenance, Turnaround and Rehabilitation Services.

Our Company has worked with scores of multinational companies such as General Electric, Alstom, Hitachi, Marubeni and with leading Chinese EPC Contractors including Harbin Electric, SEPCO-I, SEPCO-III, Tianjin Electric, Sino Hydro etc.

 

Power Plants Construction:

  • 150 MW Sheikhpura Rental Power plant, Pakistan
  • 225 MW Orient Power Plant, Pakistan
  • 234 MW Sapphire Power plant, Pakistan
  • 246 MW Hilla Power Plant, Iraq
  • 246 MW Karhala Power Plant, Iraq
  • 1250 MW Shat Al-Basra Power Plant, Iraq
  • 1320 MW Sahiwal Coal Power Project
  • 1320 MW Bin Qasim Coal Power Project
  • 1180 MW Bhikki RLNG Power Project
  • 1200 MW Balloki RLNG Power Project
  • 1200 MW HBS RLNG Power Project

 

Boiler Re-Tubing:

  • Re-tubing of boilers for Wapda Faisalabad Power Station
  • Repair of boiler (Duct + Silencers) for CMI at Guddu
  • Repair of HRSG Tubes and Hot Spot Fixing at Orient Power Plant (Balloki), Pakistan
  • Repair of HRSG Tubes and Hot Spot Fixing at Sapphire Power Plant (Muridke), Pakistan
  • Repair of HRSG Tubes and Hot Spot Fixing at Saif Power Plant (Sahiwal), Pakistan
  • Re-Tubing of Boiler and Rehabilitation Work at Abu Dhabi, UAE
  • Re-Tubing of Boiler at Sui Gas Field, Dara Bukhti, Pakistan
  • Re-Tubing of Boiler at PPL Gas Field Kandkot, Pakistan

 

Electrical Substations:

  • Installation, Testing and Commissioning of 132 KV Grid Station Orient Power plant (Balloki), Pakistan
  • Installation, Testing and Commissioning of 132 KV Grid Station Sapphire Power plant (Muridke), Pakistan
  • Installation, Testing and Commissioning of 132 KV Grid Station Al-Hilla Power plant, Iraq
  • Installation, Testing and Commissioning of 132 KV Grid Station Karbala Power plant, Iraq
  • Installation, Testing and Commissioning of 400 KV GIS Grid Station Shat Al-Basra Power plant, Iraq
  • Installation, 4 x 33 KV & 9 x 66 KV Grid Stations

 

Other Works:

  • Erection, Steel Radial Gates – Marala Barrage
  • Erection, 2x110MW Units – Guddu TPS
  • Electro-Mech, Erection, 2x100MW Units – Mangla
  • Laying of H.T. Cables – Qadirabad Barrage
  • Erection of Steel Structures – Mangla Power Station
  • Laying, 11&220kV Control Cables, Mangla Power Station
  • Fabrication of Filter House & Inlet Duct to Engro Chemical
  • Fabrication of Gas Compartment & Walkways for GE